Current project in Reading, KS  5-20-12

Current project in Reading, KS 5-20-12

 

We are ready to blow cellulose insulation into the six inch walls with an R value of 19.  The walls will be tight and keep the house warm and cool.  Concrete siding is also being installed. Thankful for the many volunteer groups that have brought the build to this point.